搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • [Under Construction] Expected to be completed in 2027: a 23,000-ton forward‑deck barge with no gangway.
[Under Construction] Expected to be completed in 2027: a 23,000-ton forward‑deck barge with no gangway.
+

Share

[Under Construction] Expected to be completed in 2027: a 23,000-ton forward‑deck barge with no gangway.


Category:


Summary:


Keywords:

Deck barge

  • Vessel Details

Detailed Vessel Specifications


Reference cargo capacity:

23,000 tons

Gross Tonnage:

19538

Net tonnage:

5862

Navigation Area:

Unlimited navigation area

Completion Date:

2027

Construction Location:

China

Classification Society:

CCS

Ship length:

166.00m

Ship width:

43.00m

Ship Depth:

10.50m

Full load draft:

8,500 m

Whether there is a springboard:

None

Host Model:

8DKM-36e*2

Host power:

4500 kW × 2

Auxiliary machine:

746 kW × 3 + 650 kW × 3 + 336 kW × 1 + 300 kW × 1 + 240 kW × 1 + 200 kW × 1 + side thruster 353 kW × 1

Chuanjiao Network (Ningde) Ship Brokerage Co., Ltd.


(If you have any needs, please feel free to contact us by phone or by scanning the QR code.)

Related vessels


Deadweight tonnage:

24,570 tons

Gross Tonnage:

15247

Net Tonnage:

7469


Deadweight tonnage:

10,210 tons

Gross Tonnage:

8513

Net Tonnage:

4774


Deadweight tonnage:

9,906 tons

Gross Tonnage:

6119

Net Tonnage:

3432


Deadweight tonnage:

13,388 tons

Gross Tonnage:

8616

Net Tonnage:

4832


Fill in the vessel’s detailed specifications.


Click to upload

Please upload a JPG image no larger than 5 MB.

Publish Now

Fill in the vessel’s detailed specifications.


Publish Now
%{tishi_zhanwei}%