搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • [Under Construction] A 9,000 m³ cutter suction dredger is expected to be completed in 2026.
[Under Construction] A 9,000 m³ cutter suction dredger is expected to be completed in 2026.
+

Share

[Under Construction] A 9,000 m³ cutter suction dredger is expected to be completed in 2026.



Summary:


Keywords:

Other vessel types

  • Vessel Details
  • Rake head weight: 20 t; Rake head type: hydraulic bucket-type

    Hopper capacity: 9,000 m³; Cranes: YQ22T/22M + YQ10T/19M

Detailed Vessel Specifications


Reference cargo capacity:

Gross Tonnage:

3317

Net tonnage:

1000

Navigation Area:

Nearshore

Completion Date:

2026

Construction Location:

China

Classification Society:

CCS

Ship length:

128.60m

Ship width:

22.00m

Ship Depth:

8.80m

Full load draft:

6.25m

Whether there is a springboard:

Host Model:

DN8330ZC2*2

Host power:

4045KW*2

Auxiliary machine:

Chuanjiao Network (Ningde) Ship Brokerage Co., Ltd.


(If you have any needs, please feel free to contact us by phone or by scanning the QR code.)

Related vessels


Deadweight tonnage:

24,570 tons

Gross Tonnage:

15247

Net Tonnage:

7469


Deadweight tonnage:

10,210 tons

Gross Tonnage:

8513

Net Tonnage:

4774


Deadweight tonnage:

9,906 tons

Gross Tonnage:

6119

Net Tonnage:

3432


Deadweight tonnage:

13,388 tons

Gross Tonnage:

8616

Net Tonnage:

4832


Fill in the vessel’s detailed specifications.


Click to upload

Please upload a JPG image no larger than 5 MB.

Publish Now

Fill in the vessel’s detailed specifications.


Publish Now
%{tishi_zhanwei}%