搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • In 2023, construction of a 20-foot/1,667 TEU and a 40-foot/820 TEU container vessel.
In 2023, construction of a 20-foot/1,667 TEU and a 40-foot/820 TEU container vessel.
+

Share

In 2023, construction of a 20-foot/1,667 TEU and a 40-foot/820 TEU container vessel.



Summary:


Keywords:

Container ship

  • Vessel Details

Detailed Vessel Specifications


Reference cargo capacity:

30,000 tons

Gross Tonnage:

Net tonnage:

Navigation Area:

Nearshore

Completion Date:

2023

Construction Location:

China

Classification Society:

CCS

Ship length:

167.55m

Ship width:

27.30m

Ship Depth:

14.00m

Full load draft:

10.100m

Whether there is a springboard:

Host Model:

Guangchai 6UEC35LSE-C1

Host power:

4770 kW

Auxiliary machine:

Chuanjiao Network (Ningde) Ship Brokerage Co., Ltd.


(If you have any needs, please feel free to contact us by phone or by scanning the QR code.)

Related vessels


Deadweight tonnage:

24,570 tons

Gross Tonnage:

15247

Net Tonnage:

7469


Deadweight tonnage:

10,210 tons

Gross Tonnage:

8513

Net Tonnage:

4774


Deadweight tonnage:

9,906 tons

Gross Tonnage:

6119

Net Tonnage:

3432


Deadweight tonnage:

13,388 tons

Gross Tonnage:

8616

Net Tonnage:

4832


Fill in the vessel’s detailed specifications.


Click to upload

Please upload a JPG image no larger than 5 MB.

Publish Now

Fill in the vessel’s detailed specifications.


Publish Now
%{tishi_zhanwei}%